Yo,
I've been building sliders with trex which was pretty good but I want to build a new slider in steel and plastic on the top.
I want something really durable (as it's for a cable park). I think there's no other option than the expensive HDPE ? Do you think that 0,4 inches is enough or should I take 0,8 inches ?
Thank you
|