OK my set up is, 2-750 in rear, the 1180 in middle, 650 integrated bow saw, and 800 in lead thru out the boat. I just want to avoid the hand pump on the bow sack and tie it in with the rest of the system, and to have the ability to fill and drain it separate from the middle bag.. I have a pump to drain it and also a line for the air , was thinking of adding a tee and a ball valve off the fill line for the middle bag in the floor thru the access compartment so I can fill as I wish, but before I drilled a hole for the line to the bow sack I wanted to see if others have done this and if so how they went about it..
|