Sorry for dropping the ball on the communication end. There have been ups and downs to this project. Good news it is still in the making. Intamin is costing to much. In the millions...so no thanks. Lansing is out. Really too small for what I am planning now. I am working with the metro parks for the new site. And it looks really promising. I just don't wasn't to get hopes too high. When w break ground, then I will truly know we are there. The location will be Brighton. I have great support for a great pro shop. Might seek out a board brand to sponsor for the rental boards. The park will be big...6 large lines running. And maybe 2 2.0 systems as well. Two boat runs.stay tuned and I will try to keep everyone posted. The park system wants to know about operation during winter months. Any I ideas?
|