After the rain I let the pads settle and pumped out the anchor holes. It was actually a good thing I was delayed as they really hadn't settled and small sink holes had appeared on top of the pads. I took this opportunity to also build some ramps to each pad so I could drive the tractor/excavator up on them. This also would come in handy for the concrete. Finally I dropped a pile of spill on there ready for excavator day X 2.
Last edited by razorjaw; 02-16-2021 at 5:01 PM.
Reason: Holes on pads
|