When I was there it was still getting set up. They had two rails and two kickers. I did see the new obstacles that are going in soon. They include a kicker with transition, a rainbow with a transfer box and an incredibly long flat bar. Once they are setup and the tram system is done, it will be perfect.
The guys at the park are awesome. Keith, John, Dustin and the man running the show, Jeff all were super helpful and encouraging. I'm trying to talk my crew into making it an annual trip.
|