So Im gonna start the install of my ballast system soon and have all the basic details planned out. My main dilemma is getting water from the intake to the pumps. The intake is a bronze 1.5" pipe end with a shutoff valve on top and I need to reduce this to 2 1" lines for the pumps. Should I construct a PVC manifold or just use hard pipe? Or should I use a 1.5" Y and then reduce 2 of them down to 1" to feed into the pumps. Just not sure what would be the best and easiest way. I would appreciate any suggestions. Bill
|