OK so its been a while since I posted the hole in the floor of my boat so I thought I would recap and shoe th finished project. It only took me 2 months of 20 minutes here and 45 minutes there to get it complete. Here you go! First the pics of the floor pre-op.
Then the pics of the floor opened up. To tell you the truth it made me a little sick to my stomach after I saw it. At this time the boat only had 3.5 hours on it.
Then the fill in consisting of fiberglass and a LOT of resin.
Next is the area cleaned up and covered in carpet ordered from Skiers Choice to match.
Then you can see the slot port box loaded and installed.
Then a little carpet, grill cloth, finess and a BFH this was the end result.
Finally the easy part.
Big thanks goes to AWS, Audio Source, Sonic Electronix, Mikes Hard lemonade, and Bud Light. All of these folks made it possible to complete this project.