Seems my progress is too slow for wakeworld, been bumped to the archive:
http://www.wakeworld.com/MB/Discus/messages/65921/700492.html Quick update, ready for the final install now. I have mounted the control pad all ready and drilled for the hinges, just got to finish it off. Should be back at the lake house in a week or so.
I wanted to check the full travel and confirm than it would travel smoothly with two rams attached. I can get 30mm up and 40mm down which should be ample.
Dad has finished the brain, he did an awesome job. Props to Pops!