I have a '97 Nautique Super Sport and am currently installing my customer ballast system. Right now I am trying to plumb my front sacs and I'm not sure how I should do it. As you can see in the drawing I have attached, I want to plumb a sac in the front locker and another small one up under the open bow. I have to run both of these sacs off of the same pump.
The first thing I was thinking of doing is how I have it set up below. I was going to run the main line from the pump to the big sac in the locker, then I was just going to hook a hose up to the top port on that sac and run it up to the sac in the open bow so it would fill after the locker sac was full. Would this work? How much pressure would it take before the top sac started filling up? I'm afraid it's going to take a lot of pressure to push the water up there. If this wouldn't work, do you have any other suggestions? Thanks for any help!