Articles
   
       
Pics/Video
       
Wake 101
   
       
       
Shop
Search
 
 
 
 
 
Home   Articles   Pics/Video   Gear   Wake 101   Events   Community   Forums   Classifieds   Contests   Shop   Search
WakeWorld Home
Email Password
Go Back   WakeWorld > >> Wakeboarding Discussion Archives > Archive through November 30, 2004

Share 
Reply
 
Thread Tools Display Modes
Old     (eternalshadow)      Join Date: Nov 2001       11-09-2004, 5:11 PM Reply   
So the family boat, was in the shop to be winterized. During the winterizing process it was also getting basic service. One of the joints in the leg was damaged and had to be either replaced for a price of 1200 or we could try and get it machined. Got the part machined and saved about 6-800 but while the boat was being serviced no one winterized it. We get a call from the dealership saying they didn't drain the block and it's split internal and external.

So the shop is replacing the engine,and if we want to upgrade at all we pay for parts, labour is free. We're thinking of added some extra horses converting from 2-4 barrel. Should give us about an extra 40, putting the total at 215. That and maybe switch to a four blade stainless.

I'm still choked though. This is going to cut into riding time as I'll have to break the engine back in for the first one-two weekends.

Reply
Share 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On



All times are GMT -7. The time now is 8:22 PM.

Home   Articles   Pics/Video   Gear   Wake 101   Events   Community   Forums   Classifieds   Contests   Shop   Search
Wake World Home

 

© 2019 eWake, Inc.    
Advertise    |    Contact    |    Terms of Use    |    Privacy Policy    |    Report Abuse    |    Conduct    |    About Us