We run a 00 malibu escape v-drive. we are going to plumb in 2 500 lb sacs in the back, 1 in the rod locker and 1 in the front ice chest with roughly 1000lbs in the front. my thoughts are 2 jabsco reversible pumps on a through hull fitting one for the front one for the back. run the hoses to fill one bag and run over to the other bag and vent on the second bag or maybe not. if i do not vent I will have to watch the bags till they fill. any suggestions would be great we will do it this week thank you
|