Articles
   
       
Pics/Video
       
Wake 101
   
       
       
Shop
Search
 
 
 
 
 
Home   Articles   Pics/Video   Gear   Wake 101   Events   Community   Forums   Classifieds   Contests   Shop   Search
WakeWorld Home
Email Password
Go Back   WakeWorld > >> Boats, Accessories & Tow Vehicles Archive > Archive through May 04, 2005

Share 
 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old     (jwat142)      Join Date: Jan 2002       04-03-2005, 11:24 AM Reply   
I have a '97 Nautique Super Sport and am currently installing my customer ballast system. Right now I am trying to plumb my front sacs and I'm not sure how I should do it. As you can see in the drawing I have attached, I want to plumb a sac in the front locker and another small one up under the open bow. I have to run both of these sacs off of the same pump.

The first thing I was thinking of doing is how I have it set up below. I was going to run the main line from the pump to the big sac in the locker, then I was just going to hook a hose up to the top port on that sac and run it up to the sac in the open bow so it would fill after the locker sac was full. Would this work? How much pressure would it take before the top sac started filling up? I'm afraid it's going to take a lot of pressure to push the water up there. If this wouldn't work, do you have any other suggestions? Thanks for any help!


 
Share 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On



All times are GMT -7. The time now is 4:57 AM.

Home   Articles   Pics/Video   Gear   Wake 101   Events   Community   Forums   Classifieds   Contests   Shop   Search
Wake World Home

 

© 2019 eWake, Inc.    
Advertise    |    Contact    |    Terms of Use    |    Privacy Policy    |    Report Abuse    |    Conduct    |    About Us